Platinum Corp Construction team on site Sydney
Platinum Corp Team · Sydney
Our Journey

Resolve the balcony as a complete drainage and waterproofing zone.

A balcony leak may involve membranes, falls, outlets, thresholds, joints, balustrades or several interfaces at once.

Balcony remediation should begin with reported symptoms, repair history and how water moves across the area. Platinum Corp Construction reviews access, demolition, thresholds, drainage, penetrations and finish reinstatement so the scope reflects the whole assembly.

Because balconies connect to occupied apartments, the programme may need resident appointments, internal protection, temporary weather controls and staged closures. Inspections and testing should occur before finishes conceal the waterproofing.

Why Us

Balcony repairs planned from threshold to outlet

Step 01

Investigate every interface

Review thresholds, terminations, outlets, penetrations and movement before defining the repair boundary.

Step 02

Coordinate apartment access

Plan notices, protection, security and temporary closures around each balcony work zone.

Step 03

Inspect before reinstatement

Complete agreed checks or testing before tiles and finishes conceal the waterproofing.

thumb
Platinum Corp Team · Sydney
Who We Are

Balcony remediation for occupied apartment buildings

The technical repair and resident experience need to be planned as one programme.

Platinum Corp Construction coordinates demolition, substrate repair, waterproofing interfaces, drainage details and finish reinstatement around building access.

Where a consultant has prepared a design, site activities and hold points can align with it. Zone-based staging helps residents understand when balconies are unavailable.