PLATINUM CORP CONSTRUCTION
Maroubra Class 2
Class 2 renovation
Maroubra, Sydney

Class 2 Apartment Renovation in Maroubra

A complete Class 2 apartment renovation combining structural alterations, services upgrades and a warm contemporary interior.

Draft case study

Project overview

This Maroubra apartment was stripped back and reworked from structure through to finishes. Structural walls were removed and new steel installed while the services, openings, flooring, kitchen and bathroom were upgraded.

Location
Maroubra, Sydney
Project type
Residential
Draft status
Before, process & after
Gallery
selected images
01

The challenge

Opening the layout required structural alterations to be coordinated with Class 2 requirements, upgraded services, fire-rated construction and the complete renewal of the apartment interior.

02

Our approach

The project combined new structural steel and plumbing stacks with a new slider and balustrade, fire-rated bulkheads, an electrical upgrade, new kitchen and bathroom, hybrid flooring, carpet and repainting.

03

The outcome

The result is a reconfigured apartment with an open kitchen and living area, renewed wet areas and updated finishes throughout. The completion record states that an occupation certificate was issued.

Delivered scope

One coordinated build program.

  • Removal of internal structural walls
  • New structural beam and steelwork
  • Replacement of external plumbing stacks
  • New kitchen and bathroom
  • New sliding door and balustrade
  • Fire-rated bulkheads, electrical upgrade and new flooring

Start a conversation

Planning something similar?

Talk to Platinum Corp Construction about the site, scope and next steps.

Discuss your project
Next project
Colebee Home